Purpose of the EP-300 power unit
The thermal power plant is designed to generate hot steam, electricity and desalted water for the technological needs of the Monomer plant in the Republic of Bashkortostan.
Composition
В состав тепловой электростанции входят два паровых котла с газо-импульсной очисткой поверхностей нагрева, суммарной производительностью 200 тонн острого пара в час (140 кгс/см?, 540°С), турбоагрегат электрический мощностью 18МВт, оборудование химводоподготовки.

WORKING
Construction of a turnkey thermal power plant, including construction and installation:
- two steam boilers E-100-13.8-545GM, produced by OJSC Sibenergomash;
- a turbine unit comprising a back-pressure steam turbine complete with a gearbox, a generator and a redundant PCS7 control system from SiemeNS;
- main building with main and part of auxiliary equipment;
- reinforced concrete smoke pipe with gas tubes; mazuton pump with consumable tanks and heaters of fuel oil;
- systems of chemical water treatment on reverse osmosis, the company "JURBYWatertech", with a capacity of 350 t / h, with the necessary tank and reagent farm;
- эстакад для подачи пара 140 кгс/см? и 16 кгс/см? на производство, прокладку электрокабелей для выдачи электрической мощности, а также вспомогательных технологических трубопроводов и силовых и контрольных кабелей, необходимых дорожных проездов и площадок для обеспечения требуемых грузопотоков;
- pumping fire extinguishing with tanks of fire water reserve; pumping oily and industrial runoff with networks; pumping household wastewater with networks.
ASUTP
The created power unit is equipped with a distributed control system for the technological process of steam production. The thermal power plant ACSUTP is built on the technical means of Yokogawa.
All equipment located in the working area has an explosion-proof execution. The installation has permission from Rostekhnadzor for use in Russia, certificates of the State Standard of the Russian Federation.
TECHNICAL CHARACTERISTICS OF THERMAL POWER STATIONS
| Parameters: | |
| pressure-out | 140 кгс/см? |
| Working steam temperature | + 540 OH S |
| Productivity of each boiler | 100 t/h |
| Parameters of the turbine: | |
| Steam in | 140 кгс/см?, |
| Operating temperature | 540 OH S |
| Steam consumption | 140 th |
| Steam pressure at release | 16 кгс/см? |
| Design power at generator terminals | 18 MW |
The company performs delivery, commissioning and training of service personnel.
Delivery of equipment 12 months from the date of conclusion of the contract and prepayment.