Equipment

Static thyristor excitation system STS for generators

Purpose of the ITS excitation system STS

Static thyristor excitation systems of the series STS-HP-XXX-XXX-UHL4 are designed to supply automatically controlled rectified current windings of excitation of turbo and hydro generators of medium power. Excitation systems can be used for both newly developed and reconstructed turbo and hydro generators.

The excitation system is designed to operate under the following conditions:

Окружающая среда - невзрывоопасная, не содержащая токопроводящей пыли в концен­трациях, снижающих уровень изоляции в недопустимых пределах. Группа условий эксплуатации в части воздействия механических факторов внешней среды М39 по ГОСТ 17516.1-90. При этом вибрация пола, где установлена система возбужде­ния, не должна превосходить ускорение 2,5м/c? в диапазоне частот 0,5-100 Гц.

STS STS2

Static excitation system with 100% reserve STS-2P-160-1050 UHL4 current 1050 A and voltage 160 V.

TECHNICAL DATA

Name of the parameter Meaning
The ceiling on the excitation voltage is not less, o.e. 2.5
Excitation ceiling at least, o.e. 2.0
The duration of the flow of the forcing current is not less, c 50
The speed of the excitation system, with 0.07
Power supply voltage of DC circuits, B
Permissible long-term deviation of voltage, %
220
+10, -15
AC supply voltage, B
Permissible change in AC supply voltage, %, long-term
380
+10, -20

The series of nominal values of rectified currents (A) is 200, 250, 320 (315, 350), 400, (450), 500, 630, 800, 1000, 1250, 1600, etc.

A number of nominal values of rectified voltages (B) - 24, 36, 48, 60, 75, 115, 130, 150, 230, 300, 345, 360, 460, etc.

WORK ROMES AND PARAMETERS OF AWAITING

The company performs supervision installation, adjustment and testing of excitation systems, warranty and post-warranty maintenance, modernization and repair of excitation systems of machines in operation, training of service personnel, technical consultations on the choice of excitation systems equipment.

Supply of excitation systems equipment is carried out in terms of 3 to 5 months from the date of prepayment.