Equipment

Excitation control cabinet SHUV D for synchronous brushless motors

Purpose of the excitation control cabinet SHUV D

The microprocessor automatic excitation regulator AVR-XX-BR-QXD, SHUV-XK-XX-XXD manufactured by Energocomplekt JSC, is designed to supply automatically controlled current of the excitation winding of the brushless synchronous motor exciter in all its operating modes. The regulator also performs the functions of control, protection and alarm about the state of the excitation system.

Excitation control cabinet SHUV D Excitation control cabinet SHUV D Excitation control cabinet SHUV D control panel

Automatic excitation regulator AVR-8-BR-Q1D and excitation control cabinet SHUV-2K-8-75D for synchronous motors.

The regulator is manufactured in the climatic version of UHL, category 4 placement according to GOST 15150 and GOST 15543 with the following influencing factors:

Working hours

The automatic excitation regulator provides:

It is envisaged to issue through dry isolated contacts the following signals about the state of the regulator and exciter:

Basic technical data

Name of the parameter Meaning
Nominal rectified current, A 8
Nominal rectified voltage, B 75
Limit rectified voltage, B 180
Duration of overload at double current, with 60
Nominal supply voltage of AC circuits (from the additional winding), B 110 - 230
Nominal supply voltage of DC circuits, B 220
Power consumption on AC circuits, W, no more

nominally
forcing


450
3000

Nominal voltage on circuits measuring the voltage of the stator, B 100
Nominal current on circuits measuring the current of the stator, A 5
Power consumption from measuring current and voltage transformers per phase, VA, no more 1

The company performs supervision installation, adjustment and testing of excitation systems, warranty and post-warranty maintenance, modernization and repair of excitation systems of machines in operation, training of service personnel, technical consultations on the choice of excitation systems equipment.

Supply of excitation systems equipment is carried out within 3 months from the date of conclusion of the contract and prepayment.